华为浩尔脑数据中心算力评估:落后美国14倍
What Huawei’s Horinger data center reveals about China’s compute gap
通过卫星遥感量化中国头部算力基础设施,数据详实且具稀缺性,直观揭示中美算力鸿沟,值得从业者关注。
This is a condensed version of a longer report on our website
这是我们要网站上发布的长篇报告的精简版
Huawei, China’s biggest AI chip developer, is drawing on China’s abundant energy to build data centers. However, because of US export controls, it lags behind its US competitor Nvidia in both chip performance and efficiency.
华为是中国最大的AI芯片开发商,正利用中国丰富的能源来建设数据中心。然而,由于美国的出口管制,其在芯片性能和效率方面均落后于美国竞争对手英伟达(Nvidia)。
As a case study, Huawei’s AI data center in Horinger, Inner Mongolia is one of the largest data centers in China by AI computing capacity, yet it has less than one-tenth the capacity of the world’s largest AI data center, Colossus 2 in Tennessee. Projected future development suggests it will remain far behind Colossus until at least 2028.
以案例研究为例,华为位于内蒙古和林格尔的AI数据中心是中国AI算力最大的数据中心之一,但其容量仅为田纳西州全球最大AI数据中心Colossus 2的不到十分之一。预计的未来发展表明,直到至少2028年,它仍将远远落后于Colossus。
This post examines the Horinger facility and Huawei’s broader AI infrastructure plans using satellite imagery and public sources, showing how we came to the above conclusions.
本文利用卫星图像和公开来源资料,考察了和林格尔设施及华为更广泛的AI基础设施计划,展示了我们如何得出上述结论。
The Horinger campus: up to 286 megawatts of IT power capacity for AI
和林格尔园区:高达286兆瓦的IT电力容量用于AI
The Huawei Horinger campus consists of three zones (West, South, and North) within the Horinger New Area. Satellite imagery shows that villages have been demolished to make way for data centers there.
华为和林格尔园区由和林格尔新区内的三个区域(西区、南区和北区)组成。卫星图像显示,当地村庄已被拆除,为数据中心让路。
While the campus likely serves a diverse set of end users and applications, Huawei documentation indicate it is equipped with “hypernode” servers that are primarily designed for large-model training and inference, which suggests a large portion of the campus is specialized for AI.
虽然该园区可能服务于多样化的终端用户和应用,但华为的文件表明其配备了“超节点”(hypernode)服务器,这些服务器主要设计用于大模型训练和推理,这表明园区的大部分专门用于AI。
We acquired commercial high-resolution satellite images of these zones to help estimate the power capacity of the buildings. Our primary method is a cooling equipment model: based on the type, size, and number of cooling units visible, we estimate their heat rejection capacity and, in turn, the buildings’ IT power capacity.
我们获取了这些区域的商业高分辨率卫星图像,以帮助估算建筑物的电力容量。我们的主要方法是冷却设备模型:根据可见的冷却单元的类型、数量和规模,我们估算其散热能力,进而推算出建筑物的IT电力容量。
The satellite imagery revealed that each zone contains nearly identical three-story buildings. However, the North zone has far fewer cooling towers than the West and South zones, suggesting that its buildings are unlikely to house powerful AI chips — modern AI servers tend to be more than 10 times as power-dense as the industry average.
卫星图像显示,每个区域都包含几乎相同的三层建筑。然而,北区的冷却塔数量远少于西区和南区,这表明其建筑物不太可能容纳高性能的AI芯片——现代AI服务器的功率密度通常是行业平均水平的十倍以上。
Left: Two data center buildings in the North zone, with three cooling towers and several small air-cooled chillers visible on the rooftop of the bottom-left building, and no discernible cooling equipment on the top-right building. Right: Two data center buildings in the South zone, with many more cooling towers and air-cooled chillers visible on the rooftops. Cooling equipment is outlined in blue. The cooling units at both sites were unchanged for at least 6 months. Image © 2026 Vantor, captured on August 18th.
左图:北区两座数据中心建筑,底部左侧建筑的屋顶可见三座冷却塔和若干小型风冷冷水机组,顶部右侧建筑则无明显冷却设备。右图:南区两座数据中心建筑,屋顶可见更多冷却塔和风冷冷水机组。冷却设备以蓝色轮廓标出。两处场地的冷却单元至少六个月未发生变化。图片 © 2026 Vantor,拍摄于8月18日。
Excluding the low-density North zone, we were left with four apparently complete buildings with dense cooling infrastructure: two in the South and two in the West. Our cooling model estimates a total of 286 megawatts (MW) of IT power capacity across these four buildings.
排除低密度的北区后,我们剩下四座看似完整且冷却基础设施密集的建筑:南区两座,西区两座。我们的冷却模型估算这四座建筑的IT功率容量总计为286兆瓦(MW)。
We’ve observed several clues suggesting the buildings are operational. As a prerequisite, the buildings appear more or less complete from the outside, including cooling, backup generators, and carparks, with no signs of ongoing construction. Second, one satellite image shows what appears to be condensed water vapor above at least one evaporative cooling tower at one building, suggesting the building is operating. Third, multiple cooling tower fans have colored “ghosts” in another image, which indicates that the fans are moving.1
我们观察到几个迹象表明这些建筑正在运营。首先,从外部看,这些建筑基本完工,包括冷却设施、备用发电机和停车场,没有 ongoing construction 的迹象。其次,一张卫星图像显示其中一座建筑至少有一个蒸发式冷却塔上方出现疑似冷凝水蒸气,表明该建筑正在运行。第三,另一张图像中多个冷却塔风扇呈现出彩色“残影”,这表明风扇正在转动。1
Only one of the four buildings, in the West zone, has yet to show any signs of operation. A public disclosure implies it was complete but not yet operational as of September 2026. We estimate it will become operational by December, while the other three are already up and running.
四座建筑中,仅有一座位于西区的建筑尚未显示出任何运营迹象。一份公开披露文件暗示,截至2026年9月,该建筑虽已完工但尚未投入运营。我们预计它将在12月前投入使用,而其他三座建筑已经上线运行。
Estimating Horinger’s compute
估算浑源的算力
The physical scale of the Huawei Horinger campus is impressive, but its compute capacity is more important for assessing China’s AI capabilities.
华为浑源园区的物理规模令人印象深刻,但其算力容量对于评估中国的人工智能能力更为重要。
Based on estimates of when power-intensive buildings at this site became operational, we used Huawei chip sales over time to estimate the chips that would fill those racks, assuming a four-month lag from sale to deployment.This resulted in a mix of Ascend 910C and 910B chips in the first building (mostly 910C), and 100% 910C in the other three buildings. Given that one building is not operational yet, we find that about 105,000 Ascend 910C chips and 8,000 Ascend 910B chips are operational to date.
基于对该站点高功耗建筑何时投入运营的估算,我们利用华为芯片随时间的销售数据来估算填满这些机架的芯片数量,假设从销售到部署有四个月的滞后。这导致第一座建筑中混合使用了昇腾910C和910B芯片(主要为910C),而其余三座建筑则100%使用910C芯片。鉴于其中一座建筑尚未投入运营,我们发现截至目前,约有10.5万颗昇腾910C芯片和8000颗昇腾910B芯片处于运营状态。
To compare Chinese and US chips, a common baseline is in “H100-equivalents” (H100e), comparing performance to the output of one H100 chip. Disclosures from Huawei point to the 910C performing at around 0.76 H100e. Meanwhile, Nvidia’s B200 and B300 chips perform at about 2.5 H100e.
为了比较中美芯片,一个常见的基准是“H100当量”(H100e),即与单颗H100芯片的性能输出进行比较。华为的披露数据显示,910C的性能约为0.76 H100e。与此同时,英伟达的B200和B300芯片性能约为2.5 H100e。
So, the estimate of operational Ascend chips corresponds to 81,000 H100-equivalents (90% CI: 36,000 to 141,000). Full calculations are available in this spreadsheet.
因此,运营中的昇腾芯片估算值相当于81,000个H100当量(90%置信区间:36,000至141,000)。完整计算过程见此电子表格。
We believe this estimate is plausible given what we know about total chip production and deployments at other data centers. According to the chip sales estimates, 907,000 Ascend 910C and 600,000 Ascend 910B chips had been sold by the end of March 2026. Satellite imagery indicates that the third AI building at Horinger was operational by August 2026. With a four-month lag between sale and deployment, our estimate suggests Huawei Horinger had used 11% of the total 910C stock by August.
鉴于我们目前掌握的芯片总产量及其他数据中心部署情况,我们认为这一估算具有合理性。根据芯片销售估算,截至2026年3月底,已售出907,000颗昇腾910C和600,000颗昇腾910B芯片。卫星图像显示,和林格尔的第三座AI大楼已于2026年8月投入运营。考虑到从销售到部署存在四个月的滞后,我们的估算表明,截至8月,华为和林格尔已使用了910C总库存的11%。
Horinger has 7% as much AI compute as the global frontrunner
和林格尔的AI算力仅为全球领先者的7%
At 81,000 H100-equivalents, Huawei Horinger is a large AI data center by today’s standards, and probably one of the largest in China. We have done a broad search of Chinese AI data centers across major hubs, and reviewed several top contenders in depth. Of those, only VNET Bayin Ulanqab and Huawei Wuhu are likely to match or slightly exceed Huawei Horinger.
以81,000个H100当量计,华为和林格尔按当今标准属于大型AI数据中心,可能也是中国最大的之一。我们对主要枢纽的中国AI数据中心进行了广泛搜索,并深入审查了若干主要竞争者。其中,只有VNET巴彦淖尔乌兰察布和华为芜湖有可能达到或略超华为和林格尔的水平。
However, Huawei Horinger is much further from the largest AI data center in the world. That title goes to SpaceX’s Colossus 2 in Tennessee. Colossus 2 has about 14 times as much computing capacity as Huawei Horinger.
然而,华为和林格尔与世界最大AI数据中心的差距仍然很大。该头衔属于SpaceX在田纳西州的Colossus 2。Colossus 2的计算能力约为华为和林格尔的14倍。
The AI compute in a data center campus is often separated into multiple densely-networked clusters, and the total capacity cannot necessarily be combined to train one AI model. However, large R&D experiments could be run even if the compute at Huawei Horinger is split into many clusters. Just 10% of Huawei Horinger’s estimated AI compute, at 8,100 H100e, is enough to train a DeepSeek-V4-Pro scale model in one month. In a very optimistic scenario, if all of Huawei Horinger’s current compute was combined for a single training run, a model the scale of GPT-6 Astra would take one year to train.
数据中心园区内的AI算力通常被划分为多个高密度网络集群,总容量未必能合并用于训练单个AI模型。然而,即使华为和林格尔的算力被分割成许多集群,仍可运行大型研发实验。仅华为和林格尔估算AI算力的10%(即8,100 H100e)就足以在一个月内训练一个DeepSeek-V4-Pro规模的模型。在最乐观的情景下,如果将华为和林格尔当前的所有算力合并用于单次训练,训练一个GPT-6 Astra规模的模型需要一年时间。
Next phase: 70% more computing power by early 2028
下一阶段:到2028年初算力增加70%
The buildout at Huawei Horinger is far from complete. As discussed above, one of the four buildings has yet to become operational, and at least three new buildings are planned beyond the six already built, based on renderings and construction sites seen in satellite imagery.
华为和林格尔的建设远未结束。如上所述,四栋建筑中尚有一栋未投入运营,且基于卫星图像中看到的效果图和施工现场,计划在已建成的六栋建筑之外至少再新建三栋。
One of these new buildings is already underway in the South zone, and based on the pace of construction, we expect it to be operational in February 2028. Assuming the new building is as AI-focused as the existing buildings, the campus could grow its total AI compute by over 70% by early 2028.
其中一座新建筑已在南区动工,根据目前的建设进度,我们预计它将于2028年2月投入运营。假设这座新建筑的AI专注程度与现有建筑相当,到2028年初,该园区的总AI算力有望增长超过70%。
A data center under construction at the Huawei Horinger campus, South zone (Image © 2026 Vantor, captured on August 18th).
华为浑源校区南区正在建设中的数据中心(图片© 2026 Vantor,拍摄于8月18日)。
With over 70% more computing power by the start of 2028, Huawei Horinger would reach about 141,000 H100e (90% CI: 65,000 to 227,000). But this would still leave it at about the same share, or a smaller one, of Colossus 2’s capacity, which we expect to reach at least 1.8 million H100e by 2028. This does not necessarily mean the overall frontier of Chinese data centers will fall further behind. For instance, Huawei’s sister campus in Wuhu will grow slightly faster, reaching a projected 151,000 H100e by December 2027.
到2028年初,华为浑园将拥有超过70%的额外算力,达到约141,000个H100e等效单位(90%置信区间:65,000至227,000)。但这仍意味着其占Colossus 2容量的份额大致相同或更小,而Colossus 2的容量我们预计到2028年将达到至少180万个H100e等效单位。这并不一定意味着中国数据中心的整体前沿水平会进一步落后。例如,华为在芜湖的姊妹园区增长速度略快,预计到2027年12月将达到151,000个H100e等效单位。
What this means for Chinese AI
这对中国人工智能意味着什么